Basrah Oil Pit Liner Project

Desription

Oil pit was designed to act as a storage for the oil and water coming from the degassing station. The oil pit allows for the separation of oil and water and to prevent the soil from contamination. BBC utilized HDPE liners with 2mm thickness with special welding tools and the latest technology of equipment to carry out this project.

Client :: BP & Basrah Oil Company
Location :: South & North Rumaila Degasing stations
Area :: 10 oil pits (250x550m)
Finished On :: 2018