top of page

PROJECT DETAILS

Oil & Soil Remediation in DS5 Lake Project

Client:

BP & ROO

Location:

DS5 North Rumalia

Area:

2million m2

Finished:

2016

DS5 is located in North Rumaila and the Lake is located towards the west of ds5. The area covers 1000 x 2000m. BBC separated the oil from the water using special skimmers and pumped approximately 1million barrels of oil to the BOC terminal.
This project is considered as one of the biggest contaminated soil projects in the world.

bottom of page